 |
| |
Toll-Free: |
|
1.800.510.5624 |
| |
|
|
 |
|
|
|
 |
|
|
| |
| |
Frog System Installation |
| |
Supplies: 6” nipple and Teflon tape (included with Cycler), hose adapter and hose (usually included with filter), pipe wrench, screw driver and check valve (optional).
- Apply Teflon tape to both ends of 6” nipple.
- Screw one end of nipple into filter head outlet. Tighten with wrench. Do not over-tighten.
- Screw left port of Cycler onto other end of nipple until upright and secure.
- Apply Teflon tape to threads of hose adapter and screw into right port of Cycler. Tighten with wrench. Do not over-tighten.
- On above ground pools, installing a check valve is optional.
Installation with Heater:
Install heater at least 5 - 10” away from Cycler. Heater should always be installed between above ground pool filter and FROG cycler, not after FROG Cycler.
Supplies: Hacksaw or PVC Cutter, PVC cement, check valve (recommended if using Bac Pac).
- Cut out section of pipe approximately 1” less than the width of feeder at ports.
- Following PVC cement directions, apply to both the pipe and the inside of the slip bushings on both ends of the Cycler.
- Insert PVC pipe into Cycler ends and hold in place 5 to 10 seconds to bond.
- With heaters using the Bac Pac, a check valve is recommended.
|
|
|
| |
|
|
|
|